{"id":237318,"date":"2024-07-10T07:22:30","date_gmt":"2024-07-10T07:22:30","guid":{"rendered":"https:\/\/namso-gen.co\/blog\/?p=237318"},"modified":"2024-07-10T07:22:30","modified_gmt":"2024-07-10T07:22:30","slug":"how-to-calculate-planned-value-in-primavera","status":"publish","type":"post","link":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/","title":{"rendered":"How to calculate planned value in Primavera?"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_62 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#How_to_Calculate_Planned_Value_in_Primavera\" title=\"How to Calculate Planned Value in Primavera?\">How to Calculate Planned Value in Primavera?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#FAQs\" title=\"FAQs\">FAQs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#1_What_is_Planned_Value_in_project_management\" title=\"1. What is Planned Value in project management?\">1. What is Planned Value in project management?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#2_How_is_Planned_Value_different_from_Earned_Value\" title=\"2. How is Planned Value different from Earned Value?\">2. How is Planned Value different from Earned Value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#3_Why_is_Planned_Value_important_in_project_management\" title=\"3. Why is Planned Value important in project management?\">3. Why is Planned Value important in project management?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#4_How_does_Primavera_calculate_Planned_Value\" title=\"4. How does Primavera calculate Planned Value?\">4. How does Primavera calculate Planned Value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#5_Can_Planned_Value_change_during_a_project\" title=\"5. Can Planned Value change during a project?\">5. Can Planned Value change during a project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#6_How_does_Planned_Value_help_in_project_forecasting\" title=\"6. How does Planned Value help in project forecasting?\">6. How does Planned Value help in project forecasting?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#7_What_are_the_limitations_of_using_Planned_Value_in_project_management\" title=\"7. What are the limitations of using Planned Value in project management?\">7. What are the limitations of using Planned Value in project management?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#8_How_often_should_Planned_Value_be_calculated_in_a_project\" title=\"8. How often should Planned Value be calculated in a project?\">8. How often should Planned Value be calculated in a project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#9_Can_Planned_Value_be_negative_in_Primavera\" title=\"9. Can Planned Value be negative in Primavera?\">9. Can Planned Value be negative in Primavera?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#10_How_can_changes_in_the_project_schedule_affect_Planned_Value\" title=\"10. How can changes in the project schedule affect Planned Value?\">10. How can changes in the project schedule affect Planned Value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#11_What_are_some_best_practices_for_using_Planned_Value_in_Primavera\" title=\"11. What are some best practices for using Planned Value in Primavera?\">11. What are some best practices for using Planned Value in Primavera?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#12_How_does_Planned_Value_help_in_identifying_project_deviations\" title=\"12. How does Planned Value help in identifying project deviations?\">12. How does Planned Value help in identifying project deviations?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Calculate_Planned_Value_in_Primavera\"><\/span>How to Calculate Planned Value in Primavera?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>In project management, planned value is an essential metric that helps in tracking the progress of a project and measuring its performance against the planned schedule. Planned Value represents the authorized budget assigned to the scheduled work to be accomplished within a specific time frame.<\/p>\n<p>To calculate Planned Value in Primavera, you need to follow these steps:<\/p>\n<p>1. Open your Primavera software and click on the project you want to calculate the Planned Value for.<br \/>\n2. Go to the &#8220;Activities&#8221; section in the project.<br \/>\n3. Select the activity or group of activities for which you want to calculate the Planned Value.<br \/>\n4. Look for the &#8220;Planned Value&#8221; field, where the Planned Value metric is displayed.<br \/>\n5. If you want to calculate the Planned Value for the entire project, you can sum up the Planned Value for all activities in the project.<\/p>\n<p>After following these steps, you will have the Planned Value for your project in Primavera, which will help you monitor the project&#8217;s progress and make informed decisions accordingly.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"FAQs\"><\/span>FAQs<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<h3><span class=\"ez-toc-section\" id=\"1_What_is_Planned_Value_in_project_management\"><\/span>1. What is Planned Value in project management?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value is the authorized budget assigned to the scheduled work to be accomplished within a specific time frame.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_How_is_Planned_Value_different_from_Earned_Value\"><\/span>2. How is Planned Value different from Earned Value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value represents the authorized budget for scheduled work, while Earned Value represents the value of work actually completed.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Why_is_Planned_Value_important_in_project_management\"><\/span>3. Why is Planned Value important in project management?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value helps project managers track project progress, measure performance against the planned schedule, and make informed decisions.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_How_does_Primavera_calculate_Planned_Value\"><\/span>4. How does Primavera calculate Planned Value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPrimavera calculates Planned Value based on the budget assigned to scheduled work within a specific time frame.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_Can_Planned_Value_change_during_a_project\"><\/span>5. Can Planned Value change during a project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value can be revised during a project if there are changes in the project scope, schedule, or budget.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_How_does_Planned_Value_help_in_project_forecasting\"><\/span>6. How does Planned Value help in project forecasting?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value provides a baseline for project performance evaluation and helps forecast project outcomes based on the planned schedule and budget.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"7_What_are_the_limitations_of_using_Planned_Value_in_project_management\"><\/span>7. What are the limitations of using Planned Value in project management?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value does not consider actual performance or external factors that may impact project progress, leading to potential discrepancies between planned and actual outcomes.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"8_How_often_should_Planned_Value_be_calculated_in_a_project\"><\/span>8. How often should Planned Value be calculated in a project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned Value should be regularly updated and monitored throughout the project lifecycle to ensure accurate tracking of project progress and performance.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"9_Can_Planned_Value_be_negative_in_Primavera\"><\/span>9. Can Planned Value be negative in Primavera?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nIn Primavera, Planned Value is typically a positive value representing the authorized budget for scheduled work. However, if there are discrepancies or errors in the budgeting process, Planned Value can potentially be negative.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"10_How_can_changes_in_the_project_schedule_affect_Planned_Value\"><\/span>10. How can changes in the project schedule affect Planned Value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nChanges in the project schedule can impact Planned Value by altering the timeline for completing scheduled work and potentially requiring adjustments to the budget allocation.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"11_What_are_some_best_practices_for_using_Planned_Value_in_Primavera\"><\/span>11. What are some best practices for using Planned Value in Primavera?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nSome best practices include establishing clear project objectives, regularly updating the project schedule and budget, and using Planned Value as a performance measurement tool.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_How_does_Planned_Value_help_in_identifying_project_deviations\"><\/span>12. How does Planned Value help in identifying project deviations?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nBy comparing the Planned Value with the Earned Value and Actual Cost, project managers can identify deviations from the planned schedule and budget, enabling them to take corrective actions to keep the project on track.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project and measuring its performance against the planned schedule. Planned Value represents the authorized budget assigned to the scheduled work to be accomplished within a specific time frame. To calculate Planned &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"How to calculate planned value in Primavera?\" class=\"read-more button\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#more-237318\">Read more<span class=\"screen-reader-text\">How to calculate planned value in Primavera?<\/span><\/a><\/p>\n","protected":false},"author":59,"featured_media":107420,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[86279],"tags":[],"class_list":["post-237318","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learn","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to calculate planned value in Primavera?<\/title>\n<meta name=\"description\" content=\"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to calculate planned value in Primavera?\" \/>\n<meta property=\"og:description\" content=\"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\" \/>\n<meta property=\"og:site_name\" content=\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/synchronyfinancial\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-10T07:22:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Francis French\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@synchrony\" \/>\n<meta name=\"twitter:site\" content=\"@synchrony\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Francis French\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\"},\"author\":{\"name\":\"Francis French\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/1622769be52c41a10d83bee2c48a8c48\"},\"headline\":\"How to calculate planned value in Primavera?\",\"datePublished\":\"2024-07-10T07:22:30+00:00\",\"dateModified\":\"2024-07-10T07:22:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\"},\"wordCount\":556,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"articleSection\":[\"Learn\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\",\"name\":\"How to calculate planned value in Primavera?\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\"},\"datePublished\":\"2024-07-10T07:22:30+00:00\",\"dateModified\":\"2024-07-10T07:22:30+00:00\",\"description\":\"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project\",\"breadcrumb\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/namso-gen.co\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to calculate planned value in Primavera?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"description\":\"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co\",\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/namso-gen.co\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"contentUrl\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"width\":500,\"height\":164,\"caption\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\"},\"image\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/synchronyfinancial\",\"https:\/\/twitter.com\/synchrony\",\"https:\/\/www.youtube.com\/synchronyfinancial\",\"https:\/\/www.instagram.com\/synchrony\",\"https:\/\/www.linkedin.com\/company\/synchrony-financial\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/1622769be52c41a10d83bee2c48a8c48\",\"name\":\"Francis French\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"caption\":\"Francis French\"},\"description\":\"Guest author Francis French has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to calculate planned value in Primavera?","description":"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/","og_locale":"en_US","og_type":"article","og_title":"How to calculate planned value in Primavera?","og_description":"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project","og_url":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/","og_site_name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","article_publisher":"https:\/\/www.facebook.com\/synchronyfinancial","article_published_time":"2024-07-10T07:22:30+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png","type":"image\/png"}],"author":"Francis French","twitter_card":"summary_large_image","twitter_creator":"@synchrony","twitter_site":"@synchrony","twitter_misc":{"Written by":"Francis French","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#article","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/"},"author":{"name":"Francis French","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/1622769be52c41a10d83bee2c48a8c48"},"headline":"How to calculate planned value in Primavera?","datePublished":"2024-07-10T07:22:30+00:00","dateModified":"2024-07-10T07:22:30+00:00","mainEntityOfPage":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/"},"wordCount":556,"commentCount":0,"publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"articleSection":["Learn"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/","url":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/","name":"How to calculate planned value in Primavera?","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/#website"},"datePublished":"2024-07-10T07:22:30+00:00","dateModified":"2024-07-10T07:22:30+00:00","description":"How to Calculate Planned Value in Primavera? In project management, planned value is an essential metric that helps in tracking the progress of a project","breadcrumb":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculate-planned-value-in-primavera\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/namso-gen.co\/blog\/"},{"@type":"ListItem","position":2,"name":"How to calculate planned value in Primavera?"}]},{"@type":"WebSite","@id":"https:\/\/namso-gen.co\/blog\/#website","url":"https:\/\/namso-gen.co\/blog\/","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","description":"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co","publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/namso-gen.co\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/namso-gen.co\/blog\/#organization","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","url":"https:\/\/namso-gen.co\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","contentUrl":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","width":500,"height":164,"caption":"Namso Gen Blog - Free Credit Card Generator [100% Valid]"},"image":{"@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/synchronyfinancial","https:\/\/twitter.com\/synchrony","https:\/\/www.youtube.com\/synchronyfinancial","https:\/\/www.instagram.com\/synchrony","https:\/\/www.linkedin.com\/company\/synchrony-financial"]},{"@type":"Person","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/1622769be52c41a10d83bee2c48a8c48","name":"Francis French","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Francis French"},"description":"Guest author Francis French has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here."}]}},"_links":{"self":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/237318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/comments?post=237318"}],"version-history":[{"count":0,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/237318\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media\/107420"}],"wp:attachment":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media?parent=237318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/categories?post=237318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/tags?post=237318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}