{"id":229530,"date":"2024-05-01T00:28:28","date_gmt":"2024-05-01T00:28:28","guid":{"rendered":"https:\/\/namso-gen.co\/blog\/?p=229530"},"modified":"2024-05-01T00:28:28","modified_gmt":"2024-05-01T00:28:28","slug":"how-to-run-a-value-stream-mapping-workshop","status":"publish","type":"post","link":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/","title":{"rendered":"How to run a value stream mapping workshop?"},"content":{"rendered":"<p>Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM helps businesses streamline their operations and improve overall productivity. However, successfully running a value stream mapping workshop requires careful planning and execution. In this article, we will discuss the steps involved in conducting an effective VSM workshop and provide answers to some commonly asked questions.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_62 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#How_to_run_a_value_stream_mapping_workshop\" title=\"How to run a value stream mapping workshop?\">How to run a value stream mapping workshop?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#FAQs\" title=\"FAQs:\">FAQs:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#1_What_are_the_benefits_of_value_stream_mapping\" title=\"1. What are the benefits of value stream mapping?\">1. What are the benefits of value stream mapping?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#2_Who_should_participate_in_a_value_stream_mapping_workshop\" title=\"2. Who should participate in a value stream mapping workshop?\">2. Who should participate in a value stream mapping workshop?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#3_How_long_does_a_value_stream_mapping_workshop_typically_take\" title=\"3. How long does a value stream mapping workshop typically take?\">3. How long does a value stream mapping workshop typically take?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#4_What_tools_can_be_used_to_create_a_value_stream_map\" title=\"4. What tools can be used to create a value stream map?\">4. What tools can be used to create a value stream map?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#5_How_often_should_value_stream_mapping_be_performed\" title=\"5. How often should value stream mapping be performed?\">5. How often should value stream mapping be performed?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#6_How_can_resistance_to_change_be_managed_during_the_workshop\" title=\"6. How can resistance to change be managed during the workshop?\">6. How can resistance to change be managed during the workshop?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#7_Can_value_stream_mapping_be_used_in_service-based_organizations\" title=\"7. Can value stream mapping be used in service-based organizations?\">7. Can value stream mapping be used in service-based organizations?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#8_What_if_the_team_encounters_difficulties_in_identifying_waste\" title=\"8. What if the team encounters difficulties in identifying waste?\">8. What if the team encounters difficulties in identifying waste?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#9_Should_the_current_state_map_be_overly_detailed\" title=\"9. Should the current state map be overly detailed?\">9. Should the current state map be overly detailed?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#10_How_can_the_sustainability_of_improvements_be_ensured\" title=\"10. How can the sustainability of improvements be ensured?\">10. How can the sustainability of improvements be ensured?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#11_Can_value_stream_mapping_be_done_remotely\" title=\"11. Can value stream mapping be done remotely?\">11. Can value stream mapping be done remotely?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#12_Can_value_stream_mapping_be_applied_to_individual_processes_within_a_larger_value_stream\" title=\"12. Can value stream mapping be applied to individual processes within a larger value stream?\">12. Can value stream mapping be applied to individual processes within a larger value stream?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"How_to_run_a_value_stream_mapping_workshop\"><\/span>How to run a value stream mapping workshop?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>\n1. **Determine the purpose:** Clearly define the objectives of the workshop. Are you aiming to identify bottlenecks, reduce lead time, or improve customer satisfaction?<br \/>\n2. **Select a cross-functional team:** Assemble a diverse group of employees from different departments involved in the value stream. This ensures a holistic perspective during the mapping process.<br \/>\n3. **Educate the team:** Provide relevant background information on value stream mapping and its benefits. Help participants understand the purpose and importance of the workshop.<br \/>\n4. **Map the current state:** Begin by mapping the current state of the value stream. Gather data and collect information on process steps, cycle times, and inventories. Use sticky notes or a digital tool to create a visual representation.<br \/>\n5. **Identify waste:** Analyze the current state map to identify areas of waste such as overproduction, waiting times, excessive transportation, or unnecessary process steps. Mark these areas with a different color or symbol.<br \/>\n6. **Brainstorm improvements:** With the team, brainstorm potential improvements and solutions to eliminate or reduce the identified waste. Encourage everyone to contribute their ideas and thoughts.<br \/>\n7. **Create the future state map:** Based on the identified improvements, design a future state value stream map. This represents the ideal state of the value stream that achieves the desired objectives.<br \/>\n8. **Plan implementation:** Develop an action plan outlining the steps needed to implement the improvements. Assign responsibilities and set realistic timelines for each action item.<br \/>\n9. **Prioritize improvements:** Determine which improvements will have the most significant impact on the value stream and prioritize their implementation. Consider factors such as feasibility, cost, and potential benefits.<br \/>\n10. **Visualize the changes:** Communicate the future state map and action plan to stakeholders and team members. Engage them in the visualization process to ensure a shared understanding and commitment to the proposed changes.<br \/>\n11. **Implement, measure, and improve:** Execute the action plan, track progress, and measure the impact of the implemented changes. Continuously review and refine the value stream to achieve further improvements.<br \/>\n12. **Sustain the improvements:** Develop a system to sustain the improvements and monitor the value stream regularly. This ensures that the organization remains focused on continuous improvement and sustains the efficiency gains achieved through VSM.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"FAQs\"><\/span>FAQs:<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<h3><span class=\"ez-toc-section\" id=\"1_What_are_the_benefits_of_value_stream_mapping\"><\/span>1. What are the benefits of value stream mapping?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nValue stream mapping helps identify and eliminate waste, reduce lead time, improve communication among departments, enhance customer satisfaction, and increase overall operational efficiency.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Who_should_participate_in_a_value_stream_mapping_workshop\"><\/span>2. Who should participate in a value stream mapping workshop?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nCross-functional teams composed of employees from various departments involved in the value stream should participate to gain diverse perspectives and insights.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_How_long_does_a_value_stream_mapping_workshop_typically_take\"><\/span>3. How long does a value stream mapping workshop typically take?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe duration of a workshop varies depending on the complexity of the value stream. It can range from a few hours to several days, with multiple sessions if necessary.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_What_tools_can_be_used_to_create_a_value_stream_map\"><\/span>4. What tools can be used to create a value stream map?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nSticky notes, whiteboards, flip charts, or digital tools such as specialized software or online platforms can be used to create a visual representation of a value stream map.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_How_often_should_value_stream_mapping_be_performed\"><\/span>5. How often should value stream mapping be performed?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nValue stream mapping is an ongoing process. It should be performed periodically, especially when significant changes occur in the value stream or when targeted improvements need to be made.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_How_can_resistance_to_change_be_managed_during_the_workshop\"><\/span>6. How can resistance to change be managed during the workshop?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nEncourage open and transparent communication during the workshop. Address concerns or resistance to change with empathy, providing a rationale for the proposed improvements and emphasizing the potential benefits.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"7_Can_value_stream_mapping_be_used_in_service-based_organizations\"><\/span>7. Can value stream mapping be used in service-based organizations?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nAbsolutely. While VSM originated in manufacturing, its principles can be applied to service-based organizations to identify inefficiencies, optimize processes, and improve customer satisfaction.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"8_What_if_the_team_encounters_difficulties_in_identifying_waste\"><\/span>8. What if the team encounters difficulties in identifying waste?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nIf identifying waste becomes challenging, consider involving external consultants or experts who can provide insights and fresh perspectives to uncover hidden inefficiencies.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"9_Should_the_current_state_map_be_overly_detailed\"><\/span>9. Should the current state map be overly detailed?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nIt is essential to strike a balance between providing enough detail to understand the process and keeping the map clear and concise. Focus on capturing the critical elements and avoid getting lost in unnecessary details.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"10_How_can_the_sustainability_of_improvements_be_ensured\"><\/span>10. How can the sustainability of improvements be ensured?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nDevelop a culture of continuous improvement within the organization, provide necessary training, establish performance metrics, and foster employee engagement to sustain the improvements achieved through VSM.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"11_Can_value_stream_mapping_be_done_remotely\"><\/span>11. Can value stream mapping be done remotely?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nYes, value stream mapping workshops can be conducted remotely using video conferencing tools, digital collaboration platforms, and shared visual mapping software.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_Can_value_stream_mapping_be_applied_to_individual_processes_within_a_larger_value_stream\"><\/span>12. Can value stream mapping be applied to individual processes within a larger value stream?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nYes, value stream mapping can be used to analyze and optimize individual processes within a larger value stream. This can help identify specific areas of improvement before mapping the entire value stream.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM helps businesses streamline their operations and improve overall productivity. However, successfully running a value stream mapping workshop requires careful planning and execution. In this article, we will discuss the steps involved in &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"How to run a value stream mapping workshop?\" class=\"read-more button\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#more-229530\">Read more<span class=\"screen-reader-text\">How to run a value stream mapping workshop?<\/span><\/a><\/p>\n","protected":false},"author":57,"featured_media":107420,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[86279],"tags":[],"class_list":["post-229530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learn","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to run a value stream mapping workshop?<\/title>\n<meta name=\"description\" content=\"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to run a value stream mapping workshop?\" \/>\n<meta property=\"og:description\" content=\"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM\" \/>\n<meta property=\"og:url\" content=\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\" \/>\n<meta property=\"og:site_name\" content=\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/synchronyfinancial\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-01T00:28:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Casey Mayer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@synchrony\" \/>\n<meta name=\"twitter:site\" content=\"@synchrony\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Casey Mayer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\"},\"author\":{\"name\":\"Casey Mayer\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/89e431077ef417dfaa131f435124f18f\"},\"headline\":\"How to run a value stream mapping workshop?\",\"datePublished\":\"2024-05-01T00:28:28+00:00\",\"dateModified\":\"2024-05-01T00:28:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\"},\"wordCount\":861,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"articleSection\":[\"Learn\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\",\"name\":\"How to run a value stream mapping workshop?\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\"},\"datePublished\":\"2024-05-01T00:28:28+00:00\",\"dateModified\":\"2024-05-01T00:28:28+00:00\",\"description\":\"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM\",\"breadcrumb\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/namso-gen.co\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to run a value stream mapping workshop?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"description\":\"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co\",\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/namso-gen.co\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"contentUrl\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"width\":500,\"height\":164,\"caption\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\"},\"image\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/synchronyfinancial\",\"https:\/\/twitter.com\/synchrony\",\"https:\/\/www.youtube.com\/synchronyfinancial\",\"https:\/\/www.instagram.com\/synchrony\",\"https:\/\/www.linkedin.com\/company\/synchrony-financial\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/89e431077ef417dfaa131f435124f18f\",\"name\":\"Casey Mayer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"caption\":\"Casey Mayer\"},\"description\":\"Guest author Casey Mayer has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to run a value stream mapping workshop?","description":"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/","og_locale":"en_US","og_type":"article","og_title":"How to run a value stream mapping workshop?","og_description":"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM","og_url":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/","og_site_name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","article_publisher":"https:\/\/www.facebook.com\/synchronyfinancial","article_published_time":"2024-05-01T00:28:28+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png","type":"image\/png"}],"author":"Casey Mayer","twitter_card":"summary_large_image","twitter_creator":"@synchrony","twitter_site":"@synchrony","twitter_misc":{"Written by":"Casey Mayer","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#article","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/"},"author":{"name":"Casey Mayer","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/89e431077ef417dfaa131f435124f18f"},"headline":"How to run a value stream mapping workshop?","datePublished":"2024-05-01T00:28:28+00:00","dateModified":"2024-05-01T00:28:28+00:00","mainEntityOfPage":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/"},"wordCount":861,"commentCount":0,"publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"articleSection":["Learn"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/","url":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/","name":"How to run a value stream mapping workshop?","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/#website"},"datePublished":"2024-05-01T00:28:28+00:00","dateModified":"2024-05-01T00:28:28+00:00","description":"Value stream mapping (VSM) is a powerful tool used to visualize and analyze processes within an organization. By identifying waste and inefficiencies, VSM","breadcrumb":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/namso-gen.co\/blog\/how-to-run-a-value-stream-mapping-workshop\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/namso-gen.co\/blog\/"},{"@type":"ListItem","position":2,"name":"How to run a value stream mapping workshop?"}]},{"@type":"WebSite","@id":"https:\/\/namso-gen.co\/blog\/#website","url":"https:\/\/namso-gen.co\/blog\/","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","description":"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co","publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/namso-gen.co\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/namso-gen.co\/blog\/#organization","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","url":"https:\/\/namso-gen.co\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","contentUrl":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","width":500,"height":164,"caption":"Namso Gen Blog - Free Credit Card Generator [100% Valid]"},"image":{"@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/synchronyfinancial","https:\/\/twitter.com\/synchrony","https:\/\/www.youtube.com\/synchronyfinancial","https:\/\/www.instagram.com\/synchrony","https:\/\/www.linkedin.com\/company\/synchrony-financial"]},{"@type":"Person","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/89e431077ef417dfaa131f435124f18f","name":"Casey Mayer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Casey Mayer"},"description":"Guest author Casey Mayer has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here."}]}},"_links":{"self":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/229530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/comments?post=229530"}],"version-history":[{"count":0,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/229530\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media\/107420"}],"wp:attachment":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media?parent=229530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/categories?post=229530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/tags?post=229530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}