{"id":221860,"date":"2023-12-21T03:37:34","date_gmt":"2023-12-21T03:37:34","guid":{"rendered":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/"},"modified":"2023-12-21T03:37:34","modified_gmt":"2023-12-21T03:37:34","slug":"what-is-contract-value-in-construction","status":"publish","type":"post","link":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/","title":{"rendered":"What is contract value in construction?"},"content":{"rendered":"<p>Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents the amount of money that will be paid by the client to the contractor for completing the project as per the specified terms and conditions outlined in the contract. The contract value is an essential component of any construction agreement as it determines the financial obligations and expectations of both parties involved.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_62 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#FAQs\" title=\"FAQs:\">FAQs:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#1_What_factors_determine_the_contract_value_in_construction\" title=\"1. What factors determine the contract value in construction?\">1. What factors determine the contract value in construction?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#2_Is_the_contract_value_fixed_or_can_it_change_during_the_project\" title=\"2. Is the contract value fixed or can it change during the project?\">2. Is the contract value fixed or can it change during the project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#3_How_is_the_contract_value_typically_calculated_in_construction\" title=\"3. How is the contract value typically calculated in construction?\">3. How is the contract value typically calculated in construction?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#4_Can_the_contract_value_be_influenced_by_changes_requested_by_the_client\" title=\"4. Can the contract value be influenced by changes requested by the client?\">4. Can the contract value be influenced by changes requested by the client?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#5_What_happens_if_the_project_costs_exceed_the_contract_value\" title=\"5. What happens if the project costs exceed the contract value?\">5. What happens if the project costs exceed the contract value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#6_Can_the_contract_value_be_adjusted_based_on_project_progress\" title=\"6. Can the contract value be adjusted based on project progress?\">6. Can the contract value be adjusted based on project progress?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#7_Is_the_contract_value_inclusive_of_taxes\" title=\"7. Is the contract value inclusive of taxes?\">7. Is the contract value inclusive of taxes?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#8_How_is_the_contract_value_impacted_by_unforeseen_circumstances_or_events\" title=\"8. How is the contract value impacted by unforeseen circumstances or events?\">8. How is the contract value impacted by unforeseen circumstances or events?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#9_Can_the_contract_value_be_revised_after_the_construction_project_has_commenced\" title=\"9. Can the contract value be revised after the construction project has commenced?\">9. Can the contract value be revised after the construction project has commenced?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#10_What_are_the_consequences_of_not_documenting_changes_to_the_contract_value\" title=\"10. What are the consequences of not documenting changes to the contract value?\">10. What are the consequences of not documenting changes to the contract value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#11_How_does_the_contract_value_affect_the_contractors_profit_margin\" title=\"11. How does the contract value affect the contractor&#8217;s profit margin?\">11. How does the contract value affect the contractor&#8217;s profit margin?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#12_Is_the_contract_value_the_same_as_the_project_cost\" title=\"12. Is the contract value the same as the project cost?\">12. Is the contract value the same as the project cost?<\/a><\/li><\/ul><\/nav><\/div>\n<h3><span class=\"ez-toc-section\" id=\"FAQs\"><\/span>FAQs:<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<h3><span class=\"ez-toc-section\" id=\"1_What_factors_determine_the_contract_value_in_construction\"><\/span>1. What factors determine the contract value in construction?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe contract value in construction is determined by several factors such as the scope of work, project complexity, materials required, labor costs, equipment expenses, and any other foreseeable expenses related to the project.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Is_the_contract_value_fixed_or_can_it_change_during_the_project\"><\/span>2. Is the contract value fixed or can it change during the project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe contract value can be either fixed or subject to change. It depends on the specific terms and conditions outlined in the contract. Some contracts have provisions for adjustments in the contract value to account for unforeseen expenses or variations in project scope.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_How_is_the_contract_value_typically_calculated_in_construction\"><\/span>3. How is the contract value typically calculated in construction?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe contract value in construction is usually calculated based on a combination of several factors such as labor costs, material costs, equipment expenses, overheads, and profits. These elements are considered by the contractor while preparing their bid or proposal for the project.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_Can_the_contract_value_be_influenced_by_changes_requested_by_the_client\"><\/span>4. Can the contract value be influenced by changes requested by the client?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nYes, the contract value can be influenced by changes requested by the client. If the client requests changes that affect the scope of work or necessitate additional resources, the contractor may negotiate for a change order which can result in an adjustment to the contract value.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_What_happens_if_the_project_costs_exceed_the_contract_value\"><\/span>5. What happens if the project costs exceed the contract value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nIf the project costs exceed the contract value, it can create financial strain for the contractor. In such cases, the contractor must discuss the situation with the client and evaluate potential solutions, such as renegotiating the contract value or agreeing to absorb some of the additional costs themselves.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_Can_the_contract_value_be_adjusted_based_on_project_progress\"><\/span>6. Can the contract value be adjusted based on project progress?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nIn certain cases, the contract value may be adjusted based on project progress. If there are significant delays or changes in the project timeline, it might be necessary to review and possibly revise the contract value to account for such variations.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"7_Is_the_contract_value_inclusive_of_taxes\"><\/span>7. Is the contract value inclusive of taxes?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe inclusion of taxes in the contract value may vary depending on the jurisdiction and the specific terms of the contract. It is essential to clarify whether the contract value is inclusive of taxes or if they will be added separately.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"8_How_is_the_contract_value_impacted_by_unforeseen_circumstances_or_events\"><\/span>8. How is the contract value impacted by unforeseen circumstances or events?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nUnforeseen circumstances or events, such as extreme weather conditions or a global pandemic, can impact the contract value. Contractors may need to negotiate with clients for additional compensation or extensions of time in order to handle the resulting delays or disruptions.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"9_Can_the_contract_value_be_revised_after_the_construction_project_has_commenced\"><\/span>9. Can the contract value be revised after the construction project has commenced?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nWhile it is not ideal, the contract value can be revised after the construction project has commenced. However, any modifications to the contract value should be mutually agreed upon and documented through formal change orders or contract amendments.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"10_What_are_the_consequences_of_not_documenting_changes_to_the_contract_value\"><\/span>10. What are the consequences of not documenting changes to the contract value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nFailure to document changes to the contract value can lead to legal disputes and disagreements between the contractor and the client. It is crucial to ensure that any modifications to the contract value are properly documented and agreed upon by both parties to avoid potential conflicts.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"11_How_does_the_contract_value_affect_the_contractors_profit_margin\"><\/span>11. How does the contract value affect the contractor&#8217;s profit margin?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe contract value plays a significant role in determining the contractor&#8217;s profit margin. If the contract value is lower than expected or the project costs exceed the contract value, it can reduce the contractor&#8217;s profit margin. Conversely, a higher contract value can potentially increase the profit margin.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_Is_the_contract_value_the_same_as_the_project_cost\"><\/span>12. Is the contract value the same as the project cost?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nThe contract value is not necessarily the same as the project cost. The contract value represents the agreed-upon amount between the contractor and the client, whereas the project cost includes all expenses related to the construction project, such as materials, labor, equipment, and overheads. The project cost can vary depending on several factors, including unforeseen circumstances and changes requested by the client.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents the amount of money that will be paid by the client to the contractor for completing the project as per the specified terms and conditions outlined in the contract. The contract &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"What is contract value in construction?\" class=\"read-more button\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#more-221860\">Read more<span class=\"screen-reader-text\">What is contract value in construction?<\/span><\/a><\/p>\n","protected":false},"author":56,"featured_media":107420,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[86279],"tags":[],"class_list":["post-221860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learn","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What is contract value in construction?<\/title>\n<meta name=\"description\" content=\"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is contract value in construction?\" \/>\n<meta property=\"og:description\" content=\"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents\" \/>\n<meta property=\"og:url\" content=\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/synchronyfinancial\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-21T03:37:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"164\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sarah Prince\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@synchrony\" \/>\n<meta name=\"twitter:site\" content=\"@synchrony\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sarah Prince\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\"},\"author\":{\"name\":\"Sarah Prince\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/80e5190de9e3c306f162d2194af9fcec\"},\"headline\":\"What is contract value in construction?\",\"datePublished\":\"2023-12-21T03:37:34+00:00\",\"dateModified\":\"2023-12-21T03:37:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\"},\"wordCount\":734,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"articleSection\":[\"Learn\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\",\"name\":\"What is contract value in construction?\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\"},\"datePublished\":\"2023-12-21T03:37:34+00:00\",\"dateModified\":\"2023-12-21T03:37:34+00:00\",\"description\":\"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents\",\"breadcrumb\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/namso-gen.co\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What is contract value in construction?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"description\":\"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co\",\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/namso-gen.co\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"contentUrl\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"width\":500,\"height\":164,\"caption\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\"},\"image\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/synchronyfinancial\",\"https:\/\/twitter.com\/synchrony\",\"https:\/\/www.youtube.com\/synchronyfinancial\",\"https:\/\/www.instagram.com\/synchrony\",\"https:\/\/www.linkedin.com\/company\/synchrony-financial\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/80e5190de9e3c306f162d2194af9fcec\",\"name\":\"Sarah Prince\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"caption\":\"Sarah Prince\"},\"description\":\"Guest author Sarah Prince has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is contract value in construction?","description":"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/","og_locale":"en_US","og_type":"article","og_title":"What is contract value in construction?","og_description":"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents","og_url":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/","og_site_name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","article_publisher":"https:\/\/www.facebook.com\/synchronyfinancial","article_published_time":"2023-12-21T03:37:34+00:00","og_image":[{"width":500,"height":164,"url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","type":"image\/png"}],"author":"Sarah Prince","twitter_card":"summary_large_image","twitter_creator":"@synchrony","twitter_site":"@synchrony","twitter_misc":{"Written by":"Sarah Prince","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#article","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/"},"author":{"name":"Sarah Prince","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/80e5190de9e3c306f162d2194af9fcec"},"headline":"What is contract value in construction?","datePublished":"2023-12-21T03:37:34+00:00","dateModified":"2023-12-21T03:37:34+00:00","mainEntityOfPage":{"@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/"},"wordCount":734,"commentCount":0,"publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"articleSection":["Learn"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/","url":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/","name":"What is contract value in construction?","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/#website"},"datePublished":"2023-12-21T03:37:34+00:00","dateModified":"2023-12-21T03:37:34+00:00","description":"Contract value in construction refers to the total monetary value agreed upon between a contractor and a client for a construction project. It represents","breadcrumb":{"@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/namso-gen.co\/blog\/what-is-contract-value-in-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/namso-gen.co\/blog\/"},{"@type":"ListItem","position":2,"name":"What is contract value in construction?"}]},{"@type":"WebSite","@id":"https:\/\/namso-gen.co\/blog\/#website","url":"https:\/\/namso-gen.co\/blog\/","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","description":"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co","publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/namso-gen.co\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/namso-gen.co\/blog\/#organization","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","url":"https:\/\/namso-gen.co\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","contentUrl":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","width":500,"height":164,"caption":"Namso Gen Blog - Free Credit Card Generator [100% Valid]"},"image":{"@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/synchronyfinancial","https:\/\/twitter.com\/synchrony","https:\/\/www.youtube.com\/synchronyfinancial","https:\/\/www.instagram.com\/synchrony","https:\/\/www.linkedin.com\/company\/synchrony-financial"]},{"@type":"Person","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/80e5190de9e3c306f162d2194af9fcec","name":"Sarah Prince","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Sarah Prince"},"description":"Guest author Sarah Prince has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here."}]}},"_links":{"self":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/221860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/users\/56"}],"replies":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/comments?post=221860"}],"version-history":[{"count":0,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/221860\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media\/107420"}],"wp:attachment":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media?parent=221860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/categories?post=221860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/tags?post=221860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}