{"id":201057,"date":"2024-11-23T08:13:19","date_gmt":"2024-11-23T08:13:19","guid":{"rendered":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/"},"modified":"2024-11-23T08:13:19","modified_gmt":"2024-11-23T08:13:19","slug":"how-to-calculated-planned-value","status":"publish","type":"post","link":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/","title":{"rendered":"How to calculated planned value?"},"content":{"rendered":"<p>Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate the planned value of a project, you can use the following formula:<\/p>\n<p>Planned Value (PV) = Budget at Completion (BAC) x Planned Percentage of Work Completed<\/p>\n<p>For example, if the total budget for a project is $100,000 and 30% of the work has been completed according to the schedule, the planned value would be:<\/p>\n<p>PV = $100,000 x 0.30 = $30,000<\/p>\n<p>Calculating the planned value allows project managers to track progress and compare it to the actual costs incurred and the earned value of the project.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_62 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#What_is_the_significance_of_planned_value_in_project_management\" title=\"What is the significance of planned value in project management?\">What is the significance of planned value in project management?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#How_does_planned_value_differ_from_earned_value\" title=\"How does planned value differ from earned value?\">How does planned value differ from earned value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#Can_planned_value_help_in_predicting_project_performance\" title=\"Can planned value help in predicting project performance?\">Can planned value help in predicting project performance?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#What_are_the_benefits_of_calculating_planned_value\" title=\"What are the benefits of calculating planned value?\">What are the benefits of calculating planned value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#How_frequently_should_planned_value_be_calculated\" title=\"How frequently should planned value be calculated?\">How frequently should planned value be calculated?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#How_can_planned_value_be_used_for_forecasting\" title=\"How can planned value be used for forecasting?\">How can planned value be used for forecasting?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#What_are_some_common_challenges_in_calculating_planned_value\" title=\"What are some common challenges in calculating planned value?\">What are some common challenges in calculating planned value?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#Is_planned_value_the_same_as_the_budget_at_completion\" title=\"Is planned value the same as the budget at completion?\">Is planned value the same as the budget at completion?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#How_does_planned_value_impact_project_performance_metrics\" title=\"How does planned value impact project performance metrics?\">How does planned value impact project performance metrics?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#Can_planned_value_be_adjusted_during_the_course_of_a_project\" title=\"Can planned value be adjusted during the course of a project?\">Can planned value be adjusted during the course of a project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#What_role_does_planned_value_play_in_project_risk_management\" title=\"What role does planned value play in project risk management?\">What role does planned value play in project risk management?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#How_can_project_stakeholders_benefit_from_understanding_planned_value\" title=\"How can project stakeholders benefit from understanding planned value?\">How can project stakeholders benefit from understanding planned value?<\/a><\/li><\/ul><\/nav><\/div>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_significance_of_planned_value_in_project_management\"><\/span>What is the significance of planned value in project management?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value helps project managers determine if the project is on track in terms of cost and schedule by providing a baseline for comparison.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_does_planned_value_differ_from_earned_value\"><\/span>How does planned value differ from earned value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value represents the budgeted cost of work scheduled to be completed, while earned value represents the budgeted cost of work actually performed.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_planned_value_help_in_predicting_project_performance\"><\/span>Can planned value help in predicting project performance?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nYes, planned value can help in predicting project performance by comparing it to the earned value and actual costs incurred.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_the_benefits_of_calculating_planned_value\"><\/span>What are the benefits of calculating planned value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nCalculating planned value helps project managers in tracking progress, identifying variances, and making informed decisions to keep the project on track.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_frequently_should_planned_value_be_calculated\"><\/span>How frequently should planned value be calculated?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value should be calculated at regular intervals, such as weekly or monthly, to monitor project progress effectively.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_can_planned_value_be_used_for_forecasting\"><\/span>How can planned value be used for forecasting?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value can be used in conjunction with earned value to forecast project completion dates and final costs.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_some_common_challenges_in_calculating_planned_value\"><\/span>What are some common challenges in calculating planned value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nSome common challenges in calculating planned value include inaccurate project schedules, changing scope, and resource constraints.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_planned_value_the_same_as_the_budget_at_completion\"><\/span>Is planned value the same as the budget at completion?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nNo, planned value represents the budgeted cost of work scheduled to be completed, while the budget at completion is the total authorized budget for the project.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_does_planned_value_impact_project_performance_metrics\"><\/span>How does planned value impact project performance metrics?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value serves as a benchmark for project performance metrics such as Schedule Performance Index (SPI) and Cost Performance Index (CPI).<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_planned_value_be_adjusted_during_the_course_of_a_project\"><\/span>Can planned value be adjusted during the course of a project?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nYes, planned value can be adjusted during the course of a project to reflect changes in the project schedule or scope.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_role_does_planned_value_play_in_project_risk_management\"><\/span>What role does planned value play in project risk management?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nPlanned value helps project managers identify potential risks early on by comparing planned costs with actual costs and earned value.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_can_project_stakeholders_benefit_from_understanding_planned_value\"><\/span>How can project stakeholders benefit from understanding planned value?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>\nProject stakeholders can benefit from understanding planned value by gaining insights into the project&#8217;s progress and performance against the planned budget and schedule.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate the planned value of a project, you can use the following formula: Planned Value (PV) = Budget at Completion (BAC) x Planned Percentage of Work Completed For example, if the total &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"How to calculated planned value?\" class=\"read-more button\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#more-201057\">Read more<span class=\"screen-reader-text\">How to calculated planned value?<\/span><\/a><\/p>\n","protected":false},"author":51,"featured_media":107420,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[86279],"tags":[],"class_list":["post-201057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learn","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to calculated planned value?<\/title>\n<meta name=\"description\" content=\"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to calculated planned value?\" \/>\n<meta property=\"og:description\" content=\"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate\" \/>\n<meta property=\"og:url\" content=\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\" \/>\n<meta property=\"og:site_name\" content=\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/synchronyfinancial\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-23T08:13:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Adam Forbes\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@synchrony\" \/>\n<meta name=\"twitter:site\" content=\"@synchrony\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adam Forbes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\"},\"author\":{\"name\":\"Adam Forbes\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/88cd882dfb29a6b147bc0ea26dc84060\"},\"headline\":\"How to calculated planned value?\",\"datePublished\":\"2024-11-23T08:13:19+00:00\",\"dateModified\":\"2024-11-23T08:13:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\"},\"wordCount\":464,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"articleSection\":[\"Learn\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\",\"name\":\"How to calculated planned value?\",\"isPartOf\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\"},\"datePublished\":\"2024-11-23T08:13:19+00:00\",\"dateModified\":\"2024-11-23T08:13:19+00:00\",\"description\":\"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate\",\"breadcrumb\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/namso-gen.co\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to calculated planned value?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#website\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"description\":\"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co\",\"publisher\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/namso-gen.co\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#organization\",\"name\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\",\"url\":\"https:\/\/namso-gen.co\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"contentUrl\":\"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png\",\"width\":500,\"height\":164,\"caption\":\"Namso Gen Blog - Free Credit Card Generator [100% Valid]\"},\"image\":{\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/synchronyfinancial\",\"https:\/\/twitter.com\/synchrony\",\"https:\/\/www.youtube.com\/synchronyfinancial\",\"https:\/\/www.instagram.com\/synchrony\",\"https:\/\/www.linkedin.com\/company\/synchrony-financial\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/88cd882dfb29a6b147bc0ea26dc84060\",\"name\":\"Adam Forbes\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g\",\"caption\":\"Adam Forbes\"},\"description\":\"Guest author Adam Forbes has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to calculated planned value?","description":"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/","og_locale":"en_US","og_type":"article","og_title":"How to calculated planned value?","og_description":"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate","og_url":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/","og_site_name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","article_publisher":"https:\/\/www.facebook.com\/synchronyfinancial","article_published_time":"2024-11-23T08:13:19+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2024\/03\/faq.png","type":"image\/png"}],"author":"Adam Forbes","twitter_card":"summary_large_image","twitter_creator":"@synchrony","twitter_site":"@synchrony","twitter_misc":{"Written by":"Adam Forbes","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#article","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/"},"author":{"name":"Adam Forbes","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/88cd882dfb29a6b147bc0ea26dc84060"},"headline":"How to calculated planned value?","datePublished":"2024-11-23T08:13:19+00:00","dateModified":"2024-11-23T08:13:19+00:00","mainEntityOfPage":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/"},"wordCount":464,"commentCount":0,"publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"articleSection":["Learn"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/","url":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/","name":"How to calculated planned value?","isPartOf":{"@id":"https:\/\/namso-gen.co\/blog\/#website"},"datePublished":"2024-11-23T08:13:19+00:00","dateModified":"2024-11-23T08:13:19+00:00","description":"Planned Value (PV) is a key project management metric that represents the authorized budget assigned to the work scheduled to be completed. To calculate","breadcrumb":{"@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/namso-gen.co\/blog\/how-to-calculated-planned-value\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/namso-gen.co\/blog\/"},{"@type":"ListItem","position":2,"name":"How to calculated planned value?"}]},{"@type":"WebSite","@id":"https:\/\/namso-gen.co\/blog\/#website","url":"https:\/\/namso-gen.co\/blog\/","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","description":"In Namso gen blog you can get many tips regarding to Credit cards, VCC, Credit card security etc. You can generate credit cards by using Namso-gen.co","publisher":{"@id":"https:\/\/namso-gen.co\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/namso-gen.co\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/namso-gen.co\/blog\/#organization","name":"Namso Gen Blog - Free Credit Card Generator [100% Valid]","url":"https:\/\/namso-gen.co\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","contentUrl":"https:\/\/namso-gen.co\/blog\/wp-content\/uploads\/2020\/07\/namso-gen-logo.png","width":500,"height":164,"caption":"Namso Gen Blog - Free Credit Card Generator [100% Valid]"},"image":{"@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/synchronyfinancial","https:\/\/twitter.com\/synchrony","https:\/\/www.youtube.com\/synchronyfinancial","https:\/\/www.instagram.com\/synchrony","https:\/\/www.linkedin.com\/company\/synchrony-financial"]},{"@type":"Person","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/88cd882dfb29a6b147bc0ea26dc84060","name":"Adam Forbes","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/namso-gen.co\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Adam Forbes"},"description":"Guest author Adam Forbes has meticulously crafted and revised this article to the best of their knowledge and understanding. Readers are strongly advised to exercise caution, verify information independently, and rely on their own judgment when considering the information provided. Read more articles on Namso Gen here."}]}},"_links":{"self":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/201057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/users\/51"}],"replies":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/comments?post=201057"}],"version-history":[{"count":0,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/posts\/201057\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media\/107420"}],"wp:attachment":[{"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/media?parent=201057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/categories?post=201057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/namso-gen.co\/blog\/wp-json\/wp\/v2\/tags?post=201057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}